Heavy Duty Connectors

Part No: 2772830000
Power Module
Availability: Typically 7-10 days
£11.02 Ex VAT (£13.22 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883350000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£16.51 Ex VAT (£19.81 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883360000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£17.19 Ex VAT (£20.63 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883370000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£18.66 Ex VAT (£22.39 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883380000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£19.06 Ex VAT (£22.87 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883390000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£5.71 Ex VAT (£6.85 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883400000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£6.39 Ex VAT (£7.67 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883410000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£7.13 Ex VAT (£8.56 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883430000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£15.61 Ex VAT (£18.73 Inc VAT)
Availability: Typically 7-10 days
Part No: 2883420000
Heavy-Duty Connectors, Accessories, Terminal Rail Mounting System
Availability: Typically 7-10 days
£7.58 Ex VAT (£9.10 Inc VAT)
Availability: Typically 7-10 days
Part No: 2716790000
HDC Enclosures, Size: , Protection Degree:
Availability: Typically 7-10 days
£33.40 Ex VAT (£40.08 Inc VAT)
Availability: Typically 7-10 days
Part No: 2716800000
HDC Enclosures, Size: , Protection Degree:
Availability: Typically 7-10 days
£4.40 Ex VAT (£5.28 Inc VAT)
Availability: Typically 7-10 days
Part No: 2559760000
HDC Enclosures, Size: 8, Protection Degree: IP65 (in PLugged Connectdition), Cover fo...
Availability: Typically 7-10 days
£22.94 Ex VAT (£22.94 Inc VAT)
Availability: Typically 7-10 days
Part No: 2784190000
Heavy-duty connectors, Crimp contact, Male, Conductor cross-section, max.: 0.3
Availability: Typically 7-10 days
£295.20 Ex VAT (£354.24 Inc VAT)
Availability: Typically 7-10 days
Part No: 1332640000
RockStar® HDC kits-Heavy-duty connectors, Plug-in connector, HighPower, 1000 V, 880 A...
Availability: Typically 7-10 days
£669.68 Ex VAT (£803.62 Inc VAT)
Availability: Typically 7-10 days
Part No: 2784140000
Heavy-duty connectors, Crimp contact, Male, Conductor cross-section, max.: 0.3
Availability: Typically 7-10 days
£295.20 Ex VAT (£354.24 Inc VAT)
Availability: Typically 7-10 days
Part No: 1912230000
Heavy-duty connectors, Accessories, Shield clip
Availability: Typically 7-10 days
£397.16 Ex VAT (£476.59 Inc VAT)
Availability: Typically 7-10 days
Part No: 2592740000
Crimping tool insert
Availability: Typically 7-10 days
£303.96 Ex VAT (£364.75 Inc VAT)
Availability: Typically 7-10 days
Part No: 2592720000
Crimping tool insert
Availability: Typically 7-10 days
£303.96 Ex VAT (£364.75 Inc VAT)
Availability: Typically 7-10 days
Part No: 2748680000
Female, gold
Availability: Typically 7-10 days
£128.60 Ex VAT (£154.32 Inc VAT)
Availability: Typically 7-10 days
Part No: 2748690000
Male, gold
Availability: Typically 7-10 days
£124.70 Ex VAT (£149.64 Inc VAT)
Availability: Typically 7-10 days
Part No: 2592680000
Locator for crimping tool
Availability: Typically 7-10 days
£140.15 Ex VAT (£168.18 Inc VAT)
Availability: Typically 7-10 days
Part No: 1987920000
HDC insert, Number of poles: 3, Size: 8
Availability: Typically 7-10 days
£90.31 Ex VAT (£108.37 Inc VAT)
Availability: Typically 7-10 days
Part No: 2668370000
Male, silver
Availability: Typically 7-10 days
£79.60 Ex VAT (£95.52 Inc VAT)
Availability: Typically 7-10 days